Batteries [3/4] LG Energy Solution vs Samsung SDI vs SK On vs CATL: Earnings, Capacity and the US Storage Race
Key takeaways
- CATL is in a different league on scale and profit: its 1H26 net income (CNY 43.3 billion, about KRW 8.6 trillion) is several times the Korean three's combined quarterly operating profit. What Korea has is eligibility: batteries that can be sold into the US.
- Strip out the 45X credit and one-off compensation, and Korean profits shrink a lot. LG Energy Solution earned KRW 756.0 billion in 3Q26, but only KRW 339.1 billion without 45X. Samsung SDI's KRW 203.8 billion in 2Q26 falls to KRW 96.1 billion.
- By end-2026, CATL has 901 GWh of capacity versus 583 GWh for the Korean three combined. US storage capacity could cover 98% of 2027 demand, which means price competition among "qualified" makers is coming.
Who is actually winning the battery business, and how healthy are the winners? This part puts the major cell makers side by side: market share, recent results, how much of their profit is real, and how much factory capacity they have where it counts.
It is part 3 of our four-part series based on an October 2026 industry report. Part 1 covered the market and US policy, part 2 the technology. Part 4 covers materials, valuations and the supply chain.
About this series
Part 1: Korea's batteries in North America and the US policy shift
Part 2: Battery chemistries, cell formats and where demand is going
Part 3: LG Energy Solution, Samsung SDI and SK On vs CATL and BYD (this post)
Part 4: Materials, storage suppliers, valuations and raw materials
The cell makers side by side
Table 1. Major battery cell makers compared
| Company | EV usage Jan-Aug 2026 (share) | ESS shipments 1H26 (share) | 2026E capacity | Main chemistry and format | Strengths | Weaknesses |
|---|---|---|---|---|---|---|
| CATL (China) | 333.0 GWh (39.4%) | 125.0 GWh (27.1%) | 901 GWh (incl. JVs) | LFP, NCM, sodium; prismatic CTP | Cost, scale, speed; 100 GWh Hungary plant | Shut out of US credits and grid market; EU investment conditions |
| BYD (China) | 127.9 GWh (15.1%) | 35.7 GWh (7.7%) | - | LFP Blade (cell-to-body) | Car-and-battery integration; 1.5 MW charging | Weak home market (domestic deliveries -33.6%) |
| LG Energy Solution (Korea) | 68.3 GWh (8.1%) | 12.0 GWh (2.6%); 13.6% in North America | 308 GWh | High-nickel pouch and 46-series; US LFP | Top Korean ESS supplier in North America; 46-series orders | Auto business loss-making; 52.8% utilization |
| CALB (China) | 44.4 GWh | 31.5 GWh (6.8%) | - | LFP, NCM prismatic | Price | Overseas plants still early |
| Gotion (China) | 41.5 GWh | 20.8 GWh (4.5%) | - | LFP, LMFP | VW ties; Slovakia plant | Restricted in the US |
| Panasonic (Japan) | 29.7 GWh (3.5%) | - | 94 GWh | NCA cylindrical 2170 | 73 GWh in the US (Nevada, Kansas); data-center storage | 4680 delayed again; customer concentration |
| EVE (China) | 29.5 GWh | 48.0 GWh (10.4%) | - | Prismatic LFP, 46-series | No. 2 in storage; 28 GWh Hungary | Blocked in the US |
| SK On (Korea) | 24.9 GWh (2.9%) | Minimal | 117 GWh | High-nickel pouch; converting to ESS LFP | Wholly owned US plants in Tennessee and Georgia | 36.4% utilization; late to storage |
| Samsung SDI (Korea) | ~14 GWh (~1.7%) | 6.4 GWh (1.4%); 6.1% in North America | 158 GWh | Prismatic NCA and LFP; 46-series | Data-center UPS/BBU; solid-state in 2027 | EV customers leaving (some BMW volume to CATL) |
| Hithium (China) | - | 46.2 GWh (10.0%); 17.2% in North America | - | Storage-only large LFP | Storage cost focus | Directly hit by EO 14421 |
| AESC (owned by China's Envision) | - | 4.6% | 27 GWh in Europe | LFP, NCM | US and European plants | PFE status uncertain |
EV data: SNE Research via Global Economic. ESS data: SNE Research via CnEVPost. Capacity: Samsung Securities (Jun 18, 2026), year-end EV + ESS. Blank cells could not be confirmed from public sources.
Recent results, and how much of the profit is real
Table 2. Latest results
| Company | Period | Revenue | Profit | Credits and one-offs |
|---|---|---|---|---|
| CATL | 1H26 | CNY 276.9 bn (+54.8%) | Net income CNY 43.3 bn (+42%); gross margin 23.9% (30.0% overseas) | CNY 20-40 bn buyback and cancellation |
| LG Energy Solution | 3Q26 (preliminary) | KRW 9.64 trn (+59%) | Operating profit KRW 756.0 bn | 45X KRW 416.9 bn; KRW 339.1 bn (3.7%) excluding it |
| Samsung SDI | 2Q26 | KRW 3.77 trn (+18.5%) | Operating profit KRW 203.8 bn, first profit in seven quarters | 45X KRW 107.7 bn; KRW 96.1 bn excluding it |
| SK On | 2Q26 | KRW 2.95 trn | Operating profit KRW 821.8 bn (record) | Includes inventory-related gains and customer compensation |
| Panasonic Energy | FY2025 (Apr 2025-Mar 2026) | Revenue +13% | - | Data-center storage offset weaker auto sales; targets JPY 950 bn of data-center storage revenue in FY2028 |
A large slice of the Korean three's profit comes from 45X and from compensation paid by automakers. That compensation is paid when a customer fails to buy its minimum volume, so it will not repeat. CATL, by contrast, earns a 30% gross margin overseas, more than at home.
CATL reported third-quarter results on October 21: revenue of CNY 165.2 billion and net income attributable to shareholders of CNY 21.2 billion (CNY 18.9 billion excluding non-recurring items). Revenue for January-September rose 56% to CNY 442.1 billion, but operating cash flow fell 24% to CNY 61.6 billion as receivables and inventory grew (CATL filing 2026-097, unaudited). Net income is not operating profit, so don't compare it directly with Korean operating figures. CATL sold 661 GWh of batteries in 2025, against 772 GWh of capacity.
Positioning: Korea wins on eligibility, China on cost
Think of a simple two-by-two. On one axis is eligibility for US policy (PFE rules, tariffs, EO 14421); on the other is cost competitiveness (LFP cost, scale, integration). The Korean three and Panasonic sit in the "eligible but higher cost" corner. The major Chinese makers sit in the "low cost but shut out of the US" corner. The most important wild card is Ford's Kentucky storage plant, built with a CATL technology license (20 GWh a year, targeted for 2027), which tries to have both. Korea's task is to bring LFP costs down before the non-China requirement for 45X rises to 70% in 2028.
Table 3. Korea's three at a glance
| Item | LG Energy Solution | Samsung SDI | SK On |
|---|---|---|---|
| 2026E capacity | 308 GWh | 158 GWh | 117 GWh |
| Utilization | 52.8% (1H26) | ~50% (2025) | 36.4% (1H26) |
| Latest quarterly operating profit | KRW 756.0 bn (3Q26; 339.1 bn ex-45X) | KRW 203.8 bn (2Q26; 96.1 bn ex-45X) | KRW 821.8 bn (2Q26, incl. one-offs) |
| US ESS capacity, end-2026E | 58 GWh | 30 GWh | 4 GWh |
| Key customers | Tesla, GM, Hyundai, VW, Honda, Stellantis, Rivian, Mercedes | BMW, Stellantis, Hyundai (Europe), US energy companies | Hyundai, VW, Mercedes, Ford (shrinking) |
| What sets it apart | Top Korean ESS supplier in North America, 46-series, LMR | Data-center UPS/BBU, solid-state | Hyundai alliance, pouch LFP storage |
LG Energy Solution: storage becomes the biggest business
- Results: 2Q26 revenue KRW 7.56 trillion and operating profit KRW 113.3 billion, a loss of KRW 127.7 billion without the KRW 241.0 billion of credits. In 3Q26, revenue jumped to KRW 9.64 trillion and operating profit to KRW 756.0 billion, still KRW 339.1 billion in profit without 45X. The core business turning profitable is the biggest change.
- Storage: It won 90 GWh of new ESS orders in 2025, has more than 140 GWh cumulative, and targets 90 GWh-plus again in 2026. Samsung Securities expects ESS revenue to grow from KRW 4.15 trillion in 1H26 (3% margin) to KRW 6.46 trillion in 2H26 (12%), becoming the largest segment from 3Q. It sees ESS at 36% of revenue in 2026 and 47% in 2027, with 45X rising from KRW 1.4 trillion to KRW 3.9 trillion.
- Orders: $4.3 billion of prismatic LFP for Tesla (July 2025), DTE Energy (May 2026), and a next-generation storage product for 2028 that cuts total cost 15%. LG's share of Tesla's battery purchases rose from 23% in 2024 to 33% in 2026 (Samsung Securities).
- Technology: 4695 cells in production in Ochang, with Arizona (36 GWh) starting at the end of 2026. Orders: Rivian 67 GWh, Mercedes 150 GWh, BMW and Chery 8 GWh. LMR prismatic cells with GM in 2028; lithium-sulfur and dry electrodes in development.
- Risks: Ford canceled a KRW 9.6 trillion (75 GWh) contract in December 2025, and a KRW 3.9 trillion FBPS contract was also canceled. Poland capacity is being cut from 80 to 60 GWh, and VW switched from high-nickel to mid-nickel. Outside cylindrical cells, the auto business still loses money.
Samsung SDI: back in profit on data centers and US storage, with solid-state as the long game
- Results: 2025 revenue of KRW 13.27 trillion with an operating loss of KRW 1.72 trillion. In 2Q26 it earned KRW 203.8 billion on KRW 3.77 trillion of revenue, its first profit in seven quarters. The 3Q26 consensus is about KRW 130-165 billion.
- Watch the one-offs: the 3Q operating-profit consensus jumped eightfold in three months, from KRW 14.8 billion to KRW 125.1 billion, mostly because of one-time items: compensation from an automaker that missed its minimum purchase volume (customer and amount undisclosed) and roughly KRW 150 billion linked to buying GM's 49.99% stake in the Synergy Cells JV (NH Investment estimate). Strip both out to judge the core recovery.
- Data centers: high-margin UPS cells made in Korea (LMO chemistry), BBU cells and power-tool cells drove results. 1.6 GWh of its North American shipments in 1H26 went to AI data centers.
- US storage: StarPlus Energy in Indiana has made NCA storage cells since 4Q25 and targets prismatic LFP from October 2026. US ESS capacity is 30 GWh, and orders fill much of it through 2029. New Carlisle (27 GWh in phase 1) targets 2027.
- Orders and sourcing: about KRW 1.5 trillion from a US energy company (2026-2029, NCA and LFP), an LFP deal with an undisclosed US automaker believed to be Tesla (January 2026), LFP cathode from L&F (about KRW 1.6 trillion over three years from 2027) and from POSCO Future M (about KRW 6 trillion, October 2026).
- Funding and technology: sold part of its Samsung Display stake for KRW 4.45 trillion. Sulfide solid-state targeted for 2H27 in Ulsan; co-developing robot batteries with Hyundai Motor Group.
- Risks: top customer BMW is selling fewer cars and moved some PHEV volume to CATL (EV batteries -24% in January-April 2026). Its EV business is the slowest to recover.

SK On: restructuring, the Hyundai alliance, and a late start in storage
- Results: 2Q26 revenue of KRW 2.95 trillion and a record KRW 821.8 billion operating profit, but more than KRW 1 trillion of inventory-related gains and customer compensation are one-offs. Utilization of 36.4% in 1H26 is the lowest of the three.
- Restructuring: after dissolving BlueOval SK with Ford, it runs the Tennessee plant alone (a separate entity since May 2026, production targeted for 2028). The Bartow, Georgia JV with Hyundai (35 GWh) began commercial production in July 2026.
- Customers: VW volume rose 98% in January-April 2026 on MEB sourcing changes, while Ford fell 35%.
- Storage: converting part of its Georgia plant to LFP storage this year and its Seosan 2 plant in Korea. Orders from NeoVolta (9 GWh) and Flatiron (1 GWh), with a 2026 target of 20 GWh-plus. Its GRIDON Gen 2 system, which combines DC blocks with power conversion in an AC block, targets commercial production in 3Q27. It also signed an LFP cathode deal with POSCO Future M worth about KRW 1.1 trillion (September 2026).
- Risks: about a year behind rivals in storage, with small US ESS capacity. Accumulated losses and debt make parent SK Innovation's support a key variable.
In one line each
- LG Energy Solution: the first to turn US policy into earnings; 2027 ESS and 45X growth are the test.
- Samsung SDI: weak in EVs, but the clearest future options in data centers, storage and solid-state.
- SK On: holding on with Hyundai and VW volume while catching up in storage. Look at profit after one-offs.
Capacity: where the factories are
By end-2026 the Korean three will have 583 GWh of large-format cell capacity combined, against 901 GWh at CATL alone. Korean plants run at 36-53% utilization, compared with roughly 90% at CATL and BYD. That is why Korean investment is now about converting lines and pushing out schedules rather than building new plants. SK Securities estimates the three's 2026 capacity additions (109 GWh) are double the increase in demand (under 50 GWh).

United States: storage capacity nearly catches up with 2027 demand

Samsung Securities puts US storage demand at 107 GWh in 2026 and 128 GWh in 2027. Allowing a one-year lag, local supply could cover 98% of 2027 demand (72% from the Korean three). In other words, from 2027 qualified US producers may start competing on price with each other. SNE Research is far more bullish, forecasting 214 GWh of North American shipments in 2030.
On the EV side, new US plants include Hyundai-LG in Georgia (April 2026), Hyundai-SK On in Bartow (35 GWh, July 2026), Panasonic Kansas (32 GWh target, adding data-center products from 2028) and LG Energy Solution's 46-series plant in Arizona (36 GWh, end-2026). Samsung SDI's New Carlisle plant (27 GWh) slipped to 2027.
Europe: Chinese capacity overtakes Korea

Korean capacity in Europe is falling as LG Energy Solution trims Poland from 80 to 60 GWh, while Chinese capacity surges with CATL's Debrecen plant in Hungary (100 GWh eventually) and new plants from EVE, CALB and Sunwoda. BNEF expects Chinese-headquartered companies to own 33% of Europe's battery capacity by 2030. Chinese storage exports are heading there too: of 298 GWh in overseas storage orders in 1H26 (+83%), about 120 GWh went to Europe, much of it diverted from the US (Caixin).
The swing factor is the EU's Industrial Accelerator Act. To qualify for public procurement and subsidies, three core battery components (five, including cells, cathodes and BMS, three years after it takes effect) would have to be made in the region, and products from FTA and GPA partners like Korea would count. Investments over EUR 100 million from countries holding more than 40% of global capacity would face conditions such as a 49% ownership cap, joint ventures and technology transfer, which hurts Chinese firms. The bill is still being negotiated.
Table 4. Other line changes worth knowing
| Company | Site | Change | Status |
|---|---|---|---|
| LG Energy Solution | Ochang, Korea | 46-series (4695) production | Running since late 2025 |
| LG Energy Solution | Wroclaw, Poland | Capacity cut; reviewing ESS and 46-series (Mercedes) | 80 to 60 GWh |
| Samsung SDI | Ulsan, Korea | Solid-state production line | Targeted for 2H27 |
| Samsung SDI | Göd, Hungary | Higher utilization on Hyundai's European volume EVs | 45 GWh |
| SK On | Seosan 2, Korea | Conversion to ESS (KRW 58.7 bn) | Under way in 2026 |
| CATL | Debrecen, Hungary | EUR 7.3 bn, 100 GWh | Plant 1 running |
| EVE | Hungary | 28 GWh | Running |
| Panasonic | Mexico | Data-center storage modules | JPY 350 bn investment over FY2026-28 |
Five traps when reading capacity numbers
- Nameplate is not sales. Output equals nameplate times months running times utilization times yield, and only customer-qualified output sells. A 40 GWh line that starts in July cannot make 40 GWh that year.
- Don't count a plant twice. Lansing's 35 GWh mixes storage LFP and EV NCM, so it is not all storage, and LG's "50 GWh-plus of North American storage" is not the sum of plant figures. The same applies to materials: POSCO Future M's converted LFP lines overlap its old high-nickel capacity.
- Canadian plants don't earn 45X. Multiplying all North American capacity by $45/kWh overstates the credit, and JV credits are shared by ownership and sometimes with customers.
- Future plants are future plants. SK On Tennessee (2028), Samsung SDI New Carlisle (2027) and Panasonic Kansas (ramping) are not running capacity today.
- Converting EV lines to storage is more than swapping materials. Electrode recipe, cell size, tabs and welding, electrolyte filling and formation, long-life testing and rack and inverter integration all change. Buildings, power and dry rooms can be reused, but not all equipment, which is why equipment orders are smaller than for new plants.
FAQ
Which Korean battery maker leads in North American energy storage?
LG Energy Solution. It had 13.6% of North American ESS shipments in 1H26, an estimated 58 GWh of US storage capacity by end-2026, and more than 140 GWh of cumulative storage orders, including a $4.3 billion prismatic LFP contract with Tesla.
How big is CATL compared with Korea's battery makers?
At end-2026, CATL has about 901 GWh of capacity versus 583 GWh for LG Energy Solution, Samsung SDI and SK On combined. In 2022 they were roughly equal. CATL and BYD also run their plants near 90%, against 36-53% for Korean makers.
What are Samsung SDI's one-off gains?
Compensation from an automaker that missed minimum purchase volumes, plus an estimated KRW 150 billion related to buying GM's stake in their Indiana JV. Both, along with the 45X credit, should be excluded when judging its core profitability.
Could the US storage battery market become oversupplied?
Samsung Securities estimates US capacity will cover 98% of 2027 demand, which points to price competition among qualified producers. Companies with long-term contracts will be better protected. SNE Research's more bullish forecast of 214 GWh by 2030 would leave more room.
References
- SNE Research (via Global Economic and CnEVPost); Samsung Securities, "Secondary Battery 2H26 Outlook" (Jun 18, 2026)
- Company results and filings: LG Energy Solution, Samsung SDI, SK Innovation, CATL (filing 2026-097), Panasonic
- Digital Daily, BizWatch, Bizhankook, NH Investment & Securities, Dailian, SK Securities, Caixin, BNEF
This post is information, not investment advice. Figures are as of October 21, 2026, and some are broker estimates. Images are the property of the companies credited.